Step 1: Select site.
The site selection is very important. You must find a place where there is enough activity.
The place where the circle is circled below is.
Step 2: Create an artificial lake (filling water).
Note: It must be closed and increases the oxygen supply machine with ambient temperature controllers. The GUI is as follows. The oxygen and power in the figure are created. Please replace it by yourself. There is only one environment temperature controller!
Internal environment:
External environment:
Step 3: Place the pump.
Note: In the figure, the pump is MEK, and the power supply is the creation of the energy cube. Please replace it yourself!
Step 4: Place a geothermal generator on the sulfur steam spring to generate electricity.
Step 5: Connect the cable to the battery.
Step 6: Guide the water from the water pump room (step 3), export the air tight fluid pipes, and store the fluid tank.
Step 7: Put a fluid pipe next to the fluid tank, right -click the fluid pipe with a wrench, connect the fluid pipe to an electrolytic separator (at least two sections, only right -click against the fluid can).
GUI:
Place (need to use the adjustment device shift+right -click two times to put the section (red) on the pipe of the electrolytic.):
Step 8: Connect the input surface of the methane synthesizer to the hydrogen export pipelines in the figure above (the exporting part of the tube diagram, connecting the cable at the bottom).
GUI (The thing in the item groove above the second gas slot is the gas gate. In Venus, it is because you can collect carbon dioxide because you put a air gates here.method.):
Step 9: The output surface of the methane synthesizer 2 is connected to the fluid pipe, and the input surface of the fluid pipe connects the gas liquefaction machine 1 (connected to the cable at the bottom).
Gas liquefaction GUI:
Step 10: Build a multi-square structure of general machinery-dynamic storage tanks for storage, and use the final mechanical pipeline transportation (the output port connecting the gas liquefaction machine 2 and dynamic valves, connect the gas liquefaction machineThe output port 2 takes the adjusttor Shift+right -click twice, and connects the adjustment device shift+right -click to connect the dynamic valve).
Step 11: Completed!
1: There is a blue circle in a certain side of the machine, and there are green spots in the middle.
2: There is a blue circle on a certain side of the machine and red dots in the middle.