GTCE Energy Management Circuit Design and Implementation of Redstone Control (Redstone Control) Minecraft Game

Basic part

1. Comparisoner circuit

A very simple circuit, compare the size of the two signals (because the result of the integer component component in the red stone control MOD in the redstone controls the absolute value of the component component is used (plus one).

Below is the power management circuit of the dual -storage box

Garbage text input!IntersectionIntersectionIntersection

In1 when setting is less than X, start charging, IN2, IIN3 connects the battery box, and the signal acquisition is obtained with comparators+red stone reading interface.OUT1 = 1, the output of the two battery box full -power signal is 15+15 = 30

The value of IN1 input is compared with the value of 15+IN2 by the value of 15, and the input redstone signal is greater than the specified ratio.In2 output 1, IN1 = in2 output 0, IN1 is less than IN2 output -1.

Stop furnace power management example

This circuit can prevent unlimited power jump of electric furnaces. It can maintain the normal operation of the blast furnace intermittently when the energy supply is insufficient.

IN1 sets the minimum boot power for the battery power IN2. It uses four multi -road selectors to control the process, and the memory read and write is used to save the context.