This tutorial is set by the author's setting without permission.
IC2EXP adds a new version to the newer version to add the reactor coolant injection (RSH) and the reactor coolant injection (LZH). The use of these two machines can easily make the automation of strong cooling nuclear power.For safety reasons, you can do the following configuration:
To ensure the normal operation of the reactor coolant injection, if the coolant injectionter does not work properly, the reactor will be stopped automatically.Cooling injectionrs cannot send signals directly according to the working status, but we can indirectly achieve this purpose by increasing energy and items cache ways.
Here I use the storage drawer and MFE as the cache, and then use the thermodynamic redstone signal relay to transmit the signal, transfer it to the door with the control signal, and finally control the reactor switch
Drop -drawing plug -in: send a redstone signal according to the reserves (because there is only one grid, which one is running)
Use the redstone signal relayr, transmit the redstone signal through the thermal pipeline, and set the threshold trigger by the way
Similar operations are also done on the MFE.
Similarly, the redstone signal relayr is triggered by threshold.Here you need to adjust the redstone signal relay to the comparator mode. Because there is no shortage of electricity, the MFE threshold is set to a high point (my configuration is not enough if the output that will end in the long -term rain)
Because my reactor is four -united, two drawers, one MFE, and a general switch are used, so the use of 4 inputs and doors is used.
Because the hot redstone signal relay output is not a strong charge, the use of PR's frame red stone line to convert the signal into a strong charge can make it extinguish the fire handle (the effect of the practical partition isolation red stone alloy wire)
In addition, EIO's quartz glass explosion -proof effect is actually better than many explosion -proof materials and is easier to remove
In the end, if this method is not considered that the bug can actually be absolutely safe, but IC2 often has some small bugs such as the wire connection abnormally. ThereforeFTB is automatically backup of MOD. If you explode, return and update IC2 to the latest stable version. If it is the latest stable version, it will be downgraded