Provincial flow: Left foot stepping on the right foot ascending Dafa+TD's unlimited flow speed pipeline
As we all know, when we use the ultimate mechanical pipeline that comes with MEK to supply the fusion pile, an interface can only be provided with 6.4B/T (128B/s)
Compared to the maximum 150B/T steam flow of the fusion pile, chat is better than nothing.And the 6.4B/T steam on the steam turbine is not the amount of the seam of the teeth.
The solution of many tutorials is to overlap more pumps, but this method is not conducive to paving the pipeline
At this time, we will take out the speed layer of thermal dynamics, the infinite flow rate
But the problem comes, the fastest pump (server) of TD can only provide 0.12b/t pumping amount, you have to stack 1250 pumps to eat full fusion piles
We need an input device with unlimited flow velocity, such as the reactor port, such as turbine valve, such as the turbine exhaust port
That's the clearness: the fusion pile was piled up by the ultimate mechanical pipe, and the steam pipe was introduced into the turbine at the speed layer.
So the water supply/steam of the polytter pile-turbine cycle will become faster and faster, until it reaches 150B/T at the upper limit of the polytter pile ...
However, it is not, the water supply in the cycle has reached 400B/T based on some unknown reasons.
In short, we have successfully run full of water and cold piles, and obtain a turbine with a power of 1/10 of the polytter pile.
By the way, the editing page-file size exceeds-, 2MB of F2 screenshots cannot be sent
The maximum flow calculation method of 150B/t from a convergence pile is derived from this