This tutorial is set by the author to use the CC By-NC-SA protocol.
Recently, I found that (I am a GTNH novice) LV lathe is very pit, and the processing rod will return 1 pole and 2 small piles.This causes the normal treatment process (for example: 3 iron ingots processing 6 shots) cannot be fully processed:
The complete processing requires the MV molder (at least), so I want to come up with a new method and make a huge sum of money to demonstrate:
Preparing one more ingot than the original, in this example, 3+1 is 4;
Put it in the lathe, return 4 and 8 small pile of powder, synthesize the small pile of powder to the ingots (after 72 seconds);
3. Put the two ingots in, process it into 2 shots+4 small stacked powder, and burn the small pile of powder into a ingot. In this way, the additional ingots are completely returned, and the 3 ingots are also fully processed into 6 rods.
When the materials such as steel cannot be burned into the melting furnace, it can be melted in the smelting furnace.
PS: The hell furnace of Natura is used here.